(630) 360-2239
CampRamapo Logo
Sneak Peek: Renovations at Riverside Campus and What It Means for Participants

Exciting changes are underway at our Riverside campus! From modernized cabins to expanded sensory spaces, this comprehensive renovation will enhance safety, accessibility, and program quality for all participants. Here’s a sneak peek at what to expect for Summer 2025 and beyond.

Major Renovation Highlights

  1. Accessible Cabins:
    • Converted four existing cabins into universally accessible lodges with roll-in showers, widened doorways, and adaptive bunks.
    • Each cabin now includes private counselor suites to ensure enhanced supervision and support.
  2. Sensory Learning Lab Expansion:
    • Doubled square footage of our indoor Sensory Lab.
    • Added new zones: a tactile wall station, immersive light-and-sound dome, and flexible therapy alcoves.
  3. Outdoor Adventure Zone:
    • Upgraded low-ropes course with ADA-compliant elements.
    • Installed a new zip-line and adaptive swing set in the challenge field.
  4. Dining Hall Modernization:
    • Expanded seating capacity by 30%.
    • Introduced an allergy-safe prep station and visual menu boards to support dietary restrictions.
  5. Green Energy & Sustainability:
    • Solar-panel array on the recreation center roof expected to cut electricity costs by 25%.
    • Rainwater harvesting system for landscape irrigation and garden programs.

Benefits for Participants

  • Inclusion: Children with mobility challenges can fully participate in cabin life and adventure activities.
  • Sensory Supports: The expanded Sensory Learning Lab offers more individualized break options and facilitates small-group social-skills workshops.
  • Safety & Comfort: Renovated cabins and dining facilities emphasize universal design, allowing participants of all abilities to navigate independently.
  • Environmental Education: New green features will be integrated into STEM clusters—campers learn about renewable energy, conservation, and sustainable agriculture.

Timeline & Access

  • Phase 1 (Completed): Accessible cabins and dining-hall upgrades (Winter 2024).
  • Phase 2 (Underway): Sensory Lab expansion and Outdoor Adventure Zone (Spring 2025).
  • Phase 3 (Summer Finish): Landscaping, garden installations, and final safety audits.

Campers attending Session B onward will enjoy the full suite of enhancements.

How You Can Help

  • Capital Campaign: We’ve raised $1.2 million of our $1.75 million goal. Donations to the “Build the Future” fund are tax-deductible—learn more at [yourwebsite.org/renovation].
  • Volunteer Build Days: Join staff and community members on May 18 for a volunteer day to paint cabin murals and plant pollinator gardens. Sign up at [yourwebsite.org/volunteer].
  • Share the News: Follow us on social media for live renovation updates, behind-the-scenes tours, and camper reactions.

Our Riverside campus is evolving to meet the needs of today’s diverse learners. We can’t wait for you to experience these improvements firsthand—here’s to a brighter, more accessible future!

Leave a Reply

Your email address will not be published. Required fields are marked *

Site is undergoing maintenance

CampRamapo

Welcome

Site will be available soon. Thank you for your patience!